Cosmic Conservative

Rational Conservatism from the heart of America

Deck Update #16... and counting

By CosmicConservative
We bought paint! I finally got to a point that my wife actually believes that it is going to be paintable so she bought paint! Wooohooo! So, when last we left our battered, tired and sweaty hero, I had just replaced a section of deck supports that I discovered had been eaten by ants in a section of the deck I had not intended to replace this year, having lost a day in the discovery of the problem. So today, another 10 hours working on the deck. I started this morning with the cedar shims and went around leveling the newly restored joists from yesterday's efforts. By the way, I had to recut five of the joists in that effort for various reasons. It took me about two hours to get the joists leveled and nailed back in. Let's see, each joist takes eight 3" nails to nail it in. Each 3" nail takes me an average of 12 whacks to get it nailed in (yes I counted them). I had to do that for 15 joists, so 15 x 8 x 12 = 1,440 whacks with the hammer, up above my head, in little 10.5" spaces between 2x8 pressure treated boards... My forearm is aching... Then, after the leveling, I decided to add braces to the deck joists so they don't twist and warp. I've been told that doing this will greatly increase the stability and solidity of the deck. So I had to cut seventeen little 10.5" wide (on average) blocks of wood, carry them up the ladder, drill holes for the screws, then use one hand to hold the block in place, one hand to hold the screwgun and drive the screw, one hand to hold the screw, and one hand to hold on to something to keep from falling. Yes, that's two more hands than I currently own. So it was a bit of a challenge, to say the least. Then I did the same to the east section of the deck (two rows since that section has much longer joists than the other section) which brought the total number of braces up to somewhere around 50. But after working from below on the first section of 17, I decided to install them from above for the next 33 or so, which was definitely easier to install, but meant measuring the space between boards, going downstairs (yes, that would be my brand-new stairs I built last week) cutting a block to fit, carrying it back upstairs, dancing across the boards I have loosely laid across the deck joists, and then kneeling down to drill the holes, hold the board and drive the screws in from the top. Then, when all that was done, I had to go back under the deck and straighten out the blocks, then screw them in from underneath, but that was a lot easier because I didn't have to hold the blocks as I drilled and screwed them in. Factoring in the hail and lightning storm we got around lunchtime, I just finished as dark was rolling in. And that included about 30 minutes working in a steady rain because I simply did not want to stop before I got at least the first section done. Probably shouldn't have done that, the temperature dropped from the mid-80's in the sun, to about 55 or so in the rain, and I was definitely feeling the chill when the rain was coming down... But now it seems that I have completed everything but the balustars, and those I hope to get done in the next couple of evenings after work. Up until now this has pretty much been a one-man affair, with a limited amount of help from my son (he is pretty good at drilling and screwing things like railing, if I mark the spots to drill and screw). But now it looks like my wife will be joining in with the sealing and painting. This better be a nice deck when we get done.... I can't imagine having put this much effort into something and then being unhappy with the results...

Comments (0)

No comments on this post.